Sao Paulo, Brazil
Jakarta-Bandung High-Speed Railway No. 4 Yard
The Challenge
Frequent lifting of 900t girders required perfect synchronization between two gantry cranes to prevent structural stress.
Our Solution
Two 450t Beam Lifting Gantry Cranes equipped with PLC Tandem Synchronization for safe and stable lifting.
Project Specifications
| Specification | Value |
|---|---|
| Yard Capacity | 2,500 girders |
| Span of Gantry | 35 m |
| Lifting Height | 12 m |
| Girder Type | 32m HSR Box Girder |
Key Results
More Projects
Sao Paulo, Brazil
Tabuk, Saudi Arabia
NEOM Vision 2030 Infrastructure Project
Constantine, Algeria
Algeria East-West Highway Viaducts
Ismailia, Egypt
New El Ferdan Railway Bridge Project
Bangkok, Thailand
Bangkok Red Line North Metro Extension
Munshiganj, Bangladesh
Padma Bridge Rail Link Project
Start Your Project
Tell us about your bridge construction project and our engineering team will provide a tailored solution within 24 hours.
