Sao Paulo, Brazil
Algeria East-West Highway Viaducts
The Challenge
Steep mountain slopes (5% gradient) and seismic activity required extremely stable lifting and transport equipment.
Our Solution
Deployed a Highway Beam Launcher with a self-balancing support system and tandem-lifting gantry cranes for yard operations.
Project Specifications
| Specification | Value |
|---|---|
| Viaduct Height | Max 90m |
| Max Span | 45m |
| T-Beams Installed | Over 3,000 |
| Design Speed | 120 km/h |
Key Results
More Projects
Sao Paulo, Brazil
Tabuk, Saudi Arabia
NEOM Vision 2030 Infrastructure Project
Ismailia, Egypt
New El Ferdan Railway Bridge Project
West Java, Indonesia
Jakarta-Bandung High-Speed Railway No. 4 Yard
Bangkok, Thailand
Bangkok Red Line North Metro Extension
Munshiganj, Bangladesh
Padma Bridge Rail Link Project
Start Your Project
Tell us about your bridge construction project and our engineering team will provide a tailored solution within 24 hours.
