Sao Paulo, Brazil
NEOM Vision 2030 Infrastructure Project
The Challenge
Transporting 900t girders over long distances in loose sand conditions and high-speed installation requirements.
Our Solution
Heavy-duty 32-axle Beam Transporters for desert stability and 900t Railway Gantries for rapid erection.
Project Specifications
| Specification | Value |
|---|---|
| Total Project Value | $500B+ |
| Girder Type | 32m Box Girder |
| Max Gradient | 3% |
| Control System | PLC Sync + Wireless |
Key Results
More Projects
Sao Paulo, Brazil
Constantine, Algeria
Algeria East-West Highway Viaducts
Ismailia, Egypt
New El Ferdan Railway Bridge Project
West Java, Indonesia
Jakarta-Bandung High-Speed Railway No. 4 Yard
Bangkok, Thailand
Bangkok Red Line North Metro Extension
Munshiganj, Bangladesh
Padma Bridge Rail Link Project
Start Your Project
Tell us about your bridge construction project and our engineering team will provide a tailored solution within 24 hours.
