Featured Project Completed

Padma Bridge Rail Link Project

Munshiganj, Bangladesh
900T Max Capacity
FEM / GB Standard

The Challenge

Extreme monsoon weather and complex riverbed conditions required highly stable, high-capacity equipment for massive box girder erection.

Our Solution

Deployed the 900t Railway Box Girder Gantry with enhanced wind resistance and GPS-guided synchronization for precise placement.

Project Specifications

Specification Value
Bridge Length 6.15 km
Box Girders 458 segments
Max Span 150 m
Pier Height Max 40 m

Key Results

Zero safety incidents during the 1,000+ girder installation
Successful operation in Level 8 wind conditions
Erection cycle: 2 days per span

Start Your Project

Tell us about your bridge construction project and our engineering team will provide a tailored solution within 24 hours.

WhatsApp QR Scan to chat
+8613673516323