Segmental Launching Gantry
Engineered for the rapid and precise in-situ assembly of precast concrete segments for long-span bridge construction.
- Capacity: 150t - 250t
- Suspension: 1,100 - 3,000T
- Span: 50m - 80m
Extreme desert heat, high saline-alkali environment, and the need for high-speed installation without disrupting canal maritime traffic.
Deployed a specialized segmental launching gantry with advanced anti-corrosion coating and heat-resistant hydraulic systems.
| Specification | Value |
|---|---|
| Bridge Length | 640m (Main span) |
| Total Steel Weight | 14,000t |
| Max Wind Resistance | Level 7 |
| Construction Period | 24 months |
Engineered for the rapid and precise in-situ assembly of precast concrete segments for long-span bridge construction.
Sao Paulo, Brazil
Tabuk, Saudi Arabia
Constantine, Algeria
West Java, Indonesia
Bangkok, Thailand
Munshiganj, Bangladesh
Tell us about your bridge construction project and our engineering team will provide a tailored solution within 24 hours.