Featured Project Completed

New El Ferdan Railway Bridge Project

Ismailia, Egypt
160T Max Capacity
FEM / DIN / GB Standard

The Challenge

Extreme desert heat, high saline-alkali environment, and the need for high-speed installation without disrupting canal maritime traffic.

Our Solution

Deployed a specialized segmental launching gantry with advanced anti-corrosion coating and heat-resistant hydraulic systems.

Project Specifications

Specification Value
Bridge Length 640m (Main span)
Total Steel Weight 14,000t
Max Wind Resistance Level 7
Construction Period 24 months

Key Results

Operational in temperatures up to 50°C
Zero disruption to Suez Canal shipping
Installation accuracy: ±2mm

Equipment Used

Segmental Launching Gantry

Engineered for the rapid and precise in-situ assembly of precast concrete segments for long-span bridge construction.

  • Capacity: 150t - 250t
  • Suspension: 1,100 - 3,000T
  • Span: 50m - 80m
View Details